We – EPG Group the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 distinct branches. For much more information: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
Description
Function
This collection solenoid is used to solitary-phase complete wave rectifying DC power offer control circuits, which voltage can attain 220V, as a part of the hydraulic solenoid directional valve. This solenoid is permitted by BSO firm Ltd. in Germany, which is matched for NG6, NG10 of REXRO EPT bolt linked solenoid directional valve.
Usual Service Circumstances
- It can be set up randomly.
- There is no fuel or du EPT which can corrupt metallic or demolish nonconductor. Or, it will impact the products life span.
- The solenoids suit for the constant obligation program or intermittent periodic responsibility system.
- The realistic wave assortment of supply voltage is amongst 85%-one hundred ten% (any particular requirements is achievable) .
- The protection is IP65 course.
Parameters
Essential Parameters
Code |
MFZ6-37YC |
Rated Voltage (V) |
12 24 110 220 |
Rated Force (N) |
≥37 |
Rated Stroke (mm) |
two.eight |
Total Stroke (mm) |
≥6.1 |
Consumed Power (W) |
≤30 |
Static Oil Pressure (MPa) |
21 |
Operating Frequency (T/h) |
12000 |
Acquire Code
Valve-Using Solenoids |
DC |
Design Code |
Rated Force(N) |
Moist |
MF |
Z |
six |
37 |
YC |
Stroke-Drive Curve
Externality & Set up Proportions
Item Code: MFZ6-37YC
Running Observe
- The socket, which solenoids utilized, is in accordance to IS04400 standard. Which includes two specs: indicator light & without mild. You can decide on according to your demands. The voltage of the socket, with indicator gentle, mu EPT conform to the voltage of solenoid alone.
- The pushpin of the solenoid is utilized in adjustment or occasionally in crisis, but when the backpressure of the technique is increased, please use screwdriver to push it, not strike it. The wallop can ruin the pushpin and the surface area of the major hole, or the solenoid will leak oil or cannot reposition.
- When solenoid is utilized in double instructions, don’t forget the solenoids can’t be energized at the same time in get to avert the solenoids from burning.
- There is a protector of over-recent between electrical management system and solenoid, in buy to prevent the solenoid and the electrical part from burning in incorrect problems.
Rationalization Of Sample
- If client have particular specifications, we can adju EPT the link dimension, the prolonged length of press pin, and the source voltage amongst solenoids and valve physique.
- Characteristic curve for reference only.
- The primary performance parameter is attained in the situations of lab. Finally explanation and modifying of the parameters by KAIDI.
Our Organization Service
1) We can help buyers layout certain merchandise or generate products according to buyers’design
two) We can print brand in accordance to buyers’ need
three)We has exported to a lot of countries,this sort of as Korea, Usa, German, and so on.
Consumer Provider
1. You might email us via the Alibaba messaging system if you have a question
or would like to submit a remark.
2. Normally, e-mail will be responded to inside 24 several hours apart from on each Sunday
and holidays. We will reply as shortly as we back again in business office.
two. We will ship you tracking information to the e-mail address you have registered with Alibaba.
three. If you do not see what you are hunting for, ju EPT send us an e-mail with image/photograph
and we will be happy to aid you.
4. Constructive feedback is quite critical to us.
Packaging & Shipping
Shipping Particulars
Supply time relies upon on the spot and EPT elements, it might up to 7 perform days.
In buy to guarantee you get you get tax cost-free upon import, we will declare it as a “Sample”with a decrease worth.This reduce cost does not replicate the complete price you paid.
Following we ship the items, we will electronic mail you the transport info, as properly as monitoring quantity.
FAQ
Queries you maybe inquiry
Q1:Could you custom made products?
We can manufacture it according to your drawings or samples.
Q2: I want to acquire your merchandise, how can I pay?
A :You can pay out by means of T/T , WE EPT UNION or EPT payment conditions we achieve settlement.
Q3: How can you promise the good quality?
A: 1 year’s guarantee once again EPT B/L day.
If You satisfy with high quality issue, we promise to liable for it.
This fall: If we will not discover what we want on your site, what ought to we do?
A: You can e mail us the descriptions and pictures of the items you need to have, We will check out no matter whether we can make it.
Q5: Can we get 1 computer of each and every merchandise for top quality testing?
A: Indeed, we comprehend top quality te EPT is crucial and we are glad to deliver 1pc for quality testing.
Q6: What is the lead time?
A: For this product, usually 3 times,3 days and lead time is calculated from the working day we acquire your deposit.
Exact time is established by factory schedule.
We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 distinct branches. For much more details: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of unique products manufacturer’s (OEM) element numbers or logos , e.g. CASE® and John Deere® are for reference purposes only and for indicating merchandise use and compatibility. Our company and the shown substitute areas contained herein are not sponsored, authorized, or manufactured by the OEM.